Frequently asked questions
Your gas meter should only be moved by your energy supplier or your local gas network operator. For more information contact your energy supplier to understand if they can move it based on your requirements.
Full details on gas safety and planning can be found on our utilities common project.
Merging two flats into one, commonly known as amalgamation is likely to require planning permission as it will impact the local planning authorities housing supply. The council’s views on this will vary from council to council. It is recommended that you contact your local planning authority to understand their position.
If you do not need to apply for planning permission then you can apply for a lawful development certificate to prove that the change is lawful.
Building regulations will be required if there are physical works taking place as part of the amalgamation, this may include removing walls or changing electrics. Visit the relevant common projects on our site for more information.
Removing a non-load bearing wall will likely not require building control approval provided it does not affect fire escape routes, ventilation, drainage or electrics.
It is best practice to get a report from a structural engineer to ensure the wall is non-load bearing prior to starting any work.
A ‘P certificate’ may refer to confirmation that electrical installations within a building are compliant with Approved Document P of the building regulations.
An electrician who is Part P certified is able to self-certify domestic work they complete, meaning you do not have to submit a building notice. To ensure your electrician is Part P certified, use a registered competent person.
Firewalls provide protection against fires spread which may occur to neighbouring properties. Building regulations ensure that modern homes are fitted with firewalls as well as other fire safety measures such as adequate fire escapes and alarm systems.
Older homes may not have a firewall installed in the loft, especially in homes with shared loft spaces. There is no requirement to retrospectively install a firewall, but it should be considered to improve the safety of your home and those living in it.
As an adjoining loft firewall is a party wall, you will need to talk to your neighbour to discuss the work.
In many circumstances, rules known as ‘permitted development’ rights allow you to extend a house without needing to apply for planning permission, providing specific limitations and conditions are met. If you want to exceed these limits and conditions, then it is likely that an application for householder planning permission will be required.
The limits and conditions for building an extension under permitted development rules are covered in our guidance on the Planning Portal, and there are other points to take into consideration.
Visit Planning Portal to find out more.
In most cases, yes - planning permission is required to operate a business from your garage. This is because the use would no longer be purely domestic, and the garage would be considered to have changed use from residential (Class C3) to a business-related use, which requires planning consent.
A bin store is classed as an outbuilding, these fall under permitted development rules meaning they are allowed as long as they adhere to a set list of rules. However, one of these rules is that outbuildings cannot be placed in front of the principal elevation*. As such, you will be required to apply for planning permission to build a bin store or any permanent structure in your front garden.
Read more about the rules for outbuildings.
Principle elevation - The most visible or prominent side of a structure, typically facing a street or public area. While often considered the 'front' of the building, it may not always contain the main entrance.
Rules governing outbuildings apply to sheds, playhouses, greenhouses and garages as well as other ancillary garden buildings such as swimming pools, ponds, sauna cabins, kennels, enclosures (including tennis courts) and many other kinds of structures for a purpose incidental to the enjoyment of the dwellinghouse.
If you are unsure if your planned building falls into the category of 'outbuildings' or if you are unsure if planning permission is required, please contact your local planning authority.
Outbuildings are considered to be permitted development, not needing planning permission, subject certain limits and conditions.
Rules governing outbuildings apply to sheds, playhouses, greenhouses and garages as well as other ancillary garden buildings such as swimming pools, ponds, sauna cabins, kennels, enclosures (including tennis courts) and many other kinds of structures for a purpose incidental to the enjoyment of the dwellinghouse.
If you are unsure if your planned building falls into the category of 'outbuildings' or if you are unsure if planning permission is required, please contact your local planning authority.
Outbuildings are considered to be permitted development, not needing planning permission, subject certain limits and conditions.
Read about the limits and conditions for outbuildings
Removing a chimney stack may fall under permitted development rights, meaning no application for planning permission is required provided certain limits and conditions are met. The permitted development right which covers this focuses on the installation, alteration or replacement of a chimney, note that this does not cover the removal of a chimney.
To ensure that the local planning authority will allow the removal of the chimney stack you can apply for a lawful development certificate. If approved no enforcement action can betaken against the change.
Rules in a conservation area may differ, in this instance you should contact your local planning authority directly to understand their position.
Building regulations approval may not be required if you are removing the external chimney stack above the roof. If works progress to the internal chimney stack or breasts, then it will require building regulations to understand the structural impacts.
If the conservatory is not separated from the house by external quality walls, doors or windows, then it will lose its building regulations exempt status. As such it will be required to adhere to thermal efficiency rules and ventilation rules.
The new opening created from removal of the door will also need building regulations approval.
Find out more from our conservatories common project
If you're doing electrical installation work in your home or garden in England or Wales, you must follow the building regulations. It's recommended to hire an installer who is registered with a competent person scheme (a registered competent person’) who can self-certify that the work meets the required standards.
Yes, under permitted development, a new dormer must not be higher than the existing highest part of the roof. It should also have materials that are in similar appearance to the existing roof. Additional limits apply in conservation areas and on listed buildings. Read about planning permission for loft conversions on Planning Portal
Building above an attached garage is treated the same as adding a storey to the rest of your home. This is considered to be permitted development, not requiring an application for planning permission provided you meet the set rules and requirements.
You will still need to submit an application for prior approval to your local planning authority.
Read the list of rules and requirements for extending upwards.
Planning permission is not required to move an internal doorway, provided it does not impact the external appearance of the building. If the building is listed, you will require listed building consent for any changes to the building.
Building regulations may apply if the wall is load bearing or is part of a fire escape route.
Read more about windows and doors from our common projects.
Adding a permanent wheelchair ramp for access to a home is likely to require planning permission as it will permanently change the external appearance of the front of the house. If the application is solely for improving disable access to the building then the planning application will be exempt from a planning fee.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
All permanent wheelchair ramps must comply with Approved Document M of the building regulations which specifies the gradient, width and surfaces which should be used.
You don't actually need to own land or property to apply for planning permission for it. This means you can apply for permission before deciding whether or not to buy a piece of land.
The following people must be informed about a planning application relating to land or buildings that they have an interest in:
- The owner or all the part-owner/s (if you are not the full owner)
- Any leaseholders with at least seven years' lease remaining
- Any agricultural tenants.
You can contact your local planning authority for pre-application advice or book an appointment with our Planning Guidance Service.
In most cases neither planning permission nor building control approval are required for replacing grass with artificial grass. If you live in a protected areas such as a conservation area, or listed building, it is best practice to contact your local planning authority to check whether any consents are required.
Find your local planning authority.
A carport can fall under permitted development rights provided it meets certain limits and conditions set out in legislation. If you exceed or fail to meet a requirement then you will require planning permission.
If not attached to the house, a car port will be treated as an ‘outbuilding’. A full list of requirements is available on our outbuildings common project.
Adding air conditioning to your home is considered permitted development provided all the limits and conditions set out in legislation are met. The limits set out the size, placement and quantity of air conditioning units allowed.
If your home is in a protected area such as a Conservation Area then permission will be required. If you live in a listed building then consent will be required.
The installation of air conditioning must comply with building regulations. It is advisable to contact an installer who can provide the necessary advice, preferably one who belongs to either the Microgeneration Certification Scheme or the relevant Competent Person Scheme.
For more information on air conditioning, read our heat pumps common project.
A pergola is classed as permitted development, meaning an application for planning permission is not required provided it meets specified conditions and limits.
Outbuildings cannot be installed on the principal elevation of the property, additionally any platform must not exceed 0.3 metres in height.
If the building is listed, then you will need to apply for listed building consent and planning permission for the change.
Building a porch at ground level and under 30 square metres in floor area is normally exempt from the need for building regulations approval.
This is provided that glazing and any fixed electrical installations comply with the appropriate sections of building regulations.
To find out more about the building regulations for porches, visit Planning Portal.
Find out more about glazing and electrical installations
To qualify as permitted development some household building work projects – notably extending a house – must not exceed limits to the volume being added.
In England, the volume allowance mostly applies to loft conversions. You can read more on the Planning Portal.
Use the volume calculator to find out the volume of several loft conversion and extension types.
An improvement notice is a notice served by a local authority requiring a property owner to carry out specified works to bring a building into compliance with the legal standards. These are most commonly served to landlords to make a building safe.
The notice will specify what works should be completed and when it should begin and be completed by.
Failure to comply with an improvement notice is a criminal offence.
Planning permission is not required if the home will be used as a short-term let for 90 days or less throughout the year.
If you plan on using the home as a short-term let for more than this time period, then you will need to apply for planning permission for a change of use.
If you rent a room in your property while you still live there, you will not require planning permission.
Land and buildings are categorised by their type and purpose through a system known as ‘use classes’. A 'Change of use' can be within the same Use Class or from one Use Class to another.
You can find a full list of use classes and change of use scenarios related to planning on the Planning Portal website.
Raising your garden level a small amount is likely to not require planning permission as it is likely to have minimal impact on the chances of flooding or overlooking your neighbours.
Increases of over 30cm may require planning permission as a significant change can impact drainage or your neighbours. If the changes are close to a boundary, you should consider whether it will overlook your neighbours or be intrusive.
You should contact your local planning authority to understand whether your proposed changes will require planning permission.
A soakaway does not normally require an application for planning permission provided it deals with surface water and does not discharge into a public sewer. Additional regulations may apply if you are in a conservation area or within the boundary of a listed building.
Building regulations will apply to the creation of a soakaway. The soakaway must comply with Part H of the building regulations which specifies where they can be located and the size that is permitted.
Read more about Approved Document H.
It is likely that you will require planning permission to extend an existing front porch to add a toilet.
Adding a porch falls within permitted development rights meaning an application for planning permission is not required provided specified limits and conditions are met. However, to fall under permitted development rights for a porch, the total ground area must not exceed three square metres. This is unlikely to be enough room to fit toilet and the required additional components.
Read the full rules for porches under permitted development on our mini guides.
If your porch exceeds these limits, it will be classified as an extension. These can be permitted development but come with a different set of rules.
Extensions are not permitted development if they are built forward of the ‘principal elevation’ of the house. As such, you will be required to submit an application for planning permission to your local planning authority.
If you live in a listed building, you will need listed building consent for any significant changes.
A dropped kerb is a sloping point in the pavement to provide access by vehicle to a property. Dropped kerbs aren’t usually a planning matter although it is recommended that you contact your local authority to find out if planning permission is required, and you will need to make a specific dropped kerb application for a domestic vehicle crossing licence to your local authority.
Work to create a dropped kerb must be carried out by a New Roads and Street Works Act accredited contractor.
Foundations are required to carry and distribute the load of the building safely. Therefore, all buildings should have adequate foundations. The factors that need to be considered when designing a foundation are:
- Type of soil
- Adjacent structures
- Trees
- Drains and sewers
- Size and construction of the new building
- Ground condition
- Landfill sites
It is advisable to contact a structural engineer or speak to a building control body about plans for new foundations.
Many homeowners choose to replace their traditional polycarbonate conservatory roof with a solid tiled roof for better thermal efficiency.
If the change significantly alters the structure or appearance of the roof, then planning permission may be required. Most alterations to roofs are considered permitted development, providing they meet the limits set out in legislation.
A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated.
Changing from a commercial use (use class E) to residential(use class C3) falls under permitted development rights, meaning an application for planning permission is not required.
To use the permitted development right you must meet the rules and regulations set out in legislation, this includes submitting an application for prior approval to the local planning authority. The full list of conditions is available on the government website, or our online application form will tell you whether you are eligible.
If you are not eligible for the permitted development right, you will have to submit an application for full planning permission.
By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.
There are different planning fees for England and Wales, and many different application types depending on the work being carried out.
You can use the Planning Portal's fee calculator to work out fees for different kinds of proposal.
Use the fee calculator (England)
Use the fee calculator (Wales)
While every effort has been taken to ensure that the fee has been calculated correctly, the determination of whether a planning fee is correct is the responsibility of the relevant local planning authority, who will check the fee is correct when the application is submitted and validated.
The green belt is a specially designated area of countryside protected from most forms of development. It is protected to help stop urban sprawl, preserve the character of existing settlements and encourage development within existing built-up areas.
The government are working on improving access to public land records, allowing you to check certain restrictions on land. You can view their progress here and see whether your land is greenbelt (note: this tool is currently under development).
You should contact your local planning authority to find out if your land is in a green belt area, and any policies or restrictions that may apply as a result.
Work that requires building control approval will require a completion notice to be submitted to the building control body. The completion notice must be sent within five days of the work being completed, once submitted, the building control body can visit the site to complete a final inspection.
If the work meets the required standards they will issue a completion certificate.
Climbing frames are classed as ‘outbuildings’ meaning they are classed as permitted development, not requiring an application provided they meet the limits set out in legislation. One of these limits is that they cannot be in front of the house.
The key restrictions for a climbing frame will be the height; how close it can be to the properties boundaries and where it can be located.
A full list of limits and conditions can be found on our outbuildings common projects.
If the climbing frame exceeds any of the limits set out in legislation an application for planning permission is required.
Verandas will often require planning permission as they do not fall under permitted development rights. If the veranda is raised over 0.3 metres, covers more than 50% of the land around your house, is on the principal elevation or on a roof then it will need planning permission.
You may require additional consents if you live in a Conservation Area or listed building. If you are unsure, you should contact your local planning authority.
For more information about planning permission for verandas and balconies, read our common project.
Bricking up an external door is classified as permitted development, meaning an application for planning permission is not required to complete the works. You will need to ensure that any materials used are of a similar appearance to the existing exterior of the house.
If you live in a listed building, then you will require planning permission and listed building consent for the change. In this instance it is best practice to talk to your local planning authority.
Find your local planning authority.
Demolishing a building may require planning permission or prior approval, depending on factors such as the building’s type, size, and location.
Before starting any demolition work, it’s important to consult your local planning authority to confirm what permissions are needed. This helps avoid the risk of enforcement action or legal consequences.
You will also need to ensure you conform to the building regulations around the demolishing of a building.
Rendering or cladding the exterior walls of your house may fall under permitted development rights, meaning an application for planning permission is not required provided you meet certain limits and requirements set out in legislation.
If you live in a listed building, you will need listed building consent for any significant works whether internal or external.
If you live in a Conservation Area, a National Park, an Area of Outstanding Natural Beauty or the Broads, you will need to apply for planning permission before cladding the outside of your house with stone, artificial stone, pebble dash, render, timber, plastic or tiles.
Outside these areas, cladding may be carried out without having to first apply for planning permission provided the materials are of a similar appearance to those used in the construction of the house.
If the new materials will not have a similar appearance to those previously used you will be required to submit an application for planning permission.
Read more about change to external walls on our common project.
Replacing existing render
Replacing existing render on the outside of your house with render of a similar appearance will not require planning permission as it is considered permitted development.
If you are changing the external appearance of the house or in a protected area such as a conservation area, then planning permission will be required. The external appearance of the house is likely to be changed when you are changing the type or colour of the render.
If the building is listed, then you will need listed building consent.
Whether or not a static caravan can be kept on your property depends on how long it will be kept there for and what it’ll be used for. If the caravan becomes a new home on the property, will be rented out, or will stay in place for more than 28 days then permission if often needed.
If no material change of use occurs, and the caravan is only used for a purpose incidental to the enjoyment of the house then often no application for planning permission will be required. In this instance it may be classed as permitted development, as such it would have to adhere to limits and conditions set out for outbuildings.
If the property is in the curtilage of a listed building or in a conservation area you should contact your local planning authority.
A 'listed building' is a building, object or structure in the UK that has been considered as of national importance in terms of architectural or historic interest and included on a register called the List of Buildings of Special Architectural or Historic Interest.
Buildings are listed to help protect the physical evidence of our past, including buildings, which are valued and protected as a central part of our cultural heritage and our sense of identity. Historic buildings also add to the quality of our lives, being an important aspect of the character and appearance of our towns, villages, and countryside.
There are three listing grades:
- Grade I - Buildings of exceptional interest
- Grade II* - Particularly important and more than special interest
- Grade II - Buildings of special interest, warranting every effort being made to preserve them (this is the most common)
If you live in a listed building it means you cannot demolish or alter the building in a way that changes its character without Listed Building Consent.
Following a grant of planning permission, it may be necessary to make amendments to the proposals that were originally approved. A non-material amendment may be applied for to approve a minor change to the planning permission which does not breach any conditions originally placed on the consent.
There is no statutory definition for ‘non-material’ as it can vary on a case-by-case basis. In general, if the change will increase the size, change the appearance of a development or have a large impact on other considerations then it will not be considered non-material.
Read more about this non-material amendment applications.
Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.
Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.
To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres.
Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.
If you live in a listed building you will require listed building consent for any major works to the property.
Whether raising the height of an external door requires planning permission depends on the location of the door, location of the property and how drastic the height change will be.
For smaller changes to the side and rear of the property, permitted development rights may apply, meaning no application or planning permission is required.
Where the height change will be substantial and have a significant impact on the building’s appearance, planning permission is likely to be required. Especially in cases where the door to be heightened is on the principal elevation of the property.
Principle elevation - The most visible or prominent side of a structure, typically facing a street or public area. While often considered the 'front' of the building, it may not always contain the main entrance.
In designated areas such as conservation areas, or on listed buildings you may require additional approvals such as listed building consent.
If you believe permitted development rights apply to a small change, you can apply for a lawful development certificate to ensure this is the case.
Building regulations
Building regulations approval will likely be required where the change impacts the structure of a building, this primarily occurs when an opening is widened. When altering walls you may want to consult a structural engineer.
You will not need to apply for planning permission if you wish to erect a new; or alter, maintain, improve or take down* an existing fence, wall or gate if certain conditions are met. If any of the conditions are not met, then you will need to apply for planning permission.
Find out about the limits and conditions for fences, gates and walls.
Fences, walls and gates do not require building regulation approval. Even though building regulations do not apply, the structures must be structurally sound and maintained.
If you share a wall with a neighbour, it may be classed as a ‘party fence wall’.
Increasing the size of a window will often fall under permitted development rights, meaning an application for planning permission is not required to make the change, provided limits and conditions are met.
Any new window must be of similar appearance to the original which you are replacing.
Permitted development rights do not apply to flats. To increase the size of a window in a flat or maisonette you will require planning permission.
If you live in a listed building, you will require listed building consent for any major changes.
Where the work has as significant impact on the external appearance of the house, especially on the principal elevation, planning permission may be required.
Building control approval will likely be required where the change impacts the structure of a building, this primarily occurs when an opening Is widened. When altering walls you may want to consult a structural engineer.
Building control will also consider energy efficiency, glazing, ventilation and fire safety.
You typically will not need planning permission to install a hot tub in your garden, as it is classed as an outbuilding and within the permitted development rights in terms of size and portability. However, you may need planning permission if you live in a listed building or conservation area, you should check first with your local authority.
The hot tub will need to adhere to the building regulations in terms of safe and adequate electrical installation by a registered competent person. Find out more about using a registered competent person.
Also, if the hot tub is placed within a building such as a large shed-style structure, there will be separate planning and building control limitations on that structure.
Planning permission is not required for internal changes such as changing a bathroom to an accessible wetroom, however, if you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
Building regulations approval will likely be required for changes to a make a bathroom accessible, specifically when the change will impact the structure of the room, drainage and electrical systems. It is recommended to have work completed by a member of the competent person scheme.
You do not need planning permission to move internal walls.
Removing a load bearing wall will require building control approval as it is altering the structure of the property. You will be required to provide a report from a structural engineer who will provide structural calculations.
Work on internal walls may also affect fire escape routes, ventilation, drainage or electrics. These should be considered during the design process and work should be carried out by a member of the competent person scheme where possible.
Adding a new driveway to an unclassified road for access to a house or business falls under permitted development rights, meaning no application for planning permission is required.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
You will have to apply to the relevant highway authority for a dropped kerb if you wish to cross a pavement to access your property.
Yes, but this type of conversion will require full planning permission. This is because you’d be changing the use of the ground floor from residential to commercial (typically to a use class such as E), while the upper floor would remain as a residential flat (Class C3). The change of use triggers the need for planning approval.
Find out more about change of use
Planning permission is not normally required for steps in a garden, however, permission may be required if the steps are part of a larger project such as a raised deck attached to the front of the house.
If the external steps are attached to the house and a roof is constructed, this will become a porch which has different rules attached. Read full details on the planning rules for porches in our common projects section.
Different rules may apply if you live in a designated area such as a conservation area or if the building you live in is listed.
External steps will not normally require building regulations approval unless they are part of the access to the building. If they are then you must ensure that you do not reduce the level of accessibility to the house.
You should contact your local planning authority for further project advice, alternatively, you can apply for a lawful development certificate for confirmation that any changes you make do not require planning permission.
You will not need planning permission if a new or replacement driveway of any size uses permeable (or porous) surfacing which allows water to drain through, or if the rainwater is directed to a lawn or border to drain naturally.
If the surface to be covered is more than five square metres planning permission will be needed for laying traditional, impermeable driveways that do not provide for the water to run to a permeable area.
This guidance applies to houses, there are different rules for flats and maisonettes, converted houses, new houses or areas where there permitted development rights may be restricted.
Read about paving your front garden
You may need to consider if a dropped kerb is required, largely dropped kerbs are not a planning matter but you will need to apply to your local council.
Find out more about dropped kerbs
Whether a lean-to requires planning permission will depend on what the lean-to is used for, it may be an extension, pergola, carport, conservatory or gazebo.
In some cases a building a lean-to will be classified as permitted development, meaning an application for planning permission is not required provided specified limits and conditions are met. If these are exceeded, then you must apply for planning permission.
Permitted development rules vary based on the type of work you are completing, visit our Mini Guides for details on the specific rules.
If you live in a listed building, you will need listed building consent for any significant changes.
Yes, but you will need to obtain planning permission. Converting a detached garage into a self-contained living space, such as annexe, studio flat, or retail unit, represents a material change of use, particularly if it will function independently from the main house. This is because the garage would no longer be used in connection with the main dwelling and would effectively become a separate residential unit.
National planning regulations allow certain alterations to be made to a property without requiring planning permission; these are known as permitted development rights. In some cases, local authorities may remove or restrict these rights for specific types of development that would otherwise be allowed. This is achieved through the use of Article 4 Directions, which are intended to protect the character, heritage, and appearance of designated areas.
If your local planning authority has issued an Article 4 Direction, some of your permitted development rights may no longer apply. As a result, you may need to submit a planning application for works that would not normally require one.
You can check whether an Article 4 Direction affects your property by visiting your local authority’s website.
Inefficient windows and doors can significantly contribute to heat loss. Replacing single glazed windows by installing double glazing can cut heat loss through windows considerably. Double glazing works by trapping air between two panes of glass creating an insulating barrier that reduces heat loss, noise and condensation.
If you can't replace all the windows, why not choose the rooms that cost you the most to heat? Other options to reduce heat loss through windows include sealing gaps or using thermal blinds.
You don’t usually need planning permission for repairs, maintenance and minor improvements or replacing windows and doors that are of a similar appearance.
Building regulations apply to replacement glazing, in terms of thermal performance, air supply, ventilation, safety and means of escape.
Read about planning and building rules for doors and windows
For houses, replacing windows with double glazing usually doesn’t require planning permission, provided the style and appearance are similar to the original. However, if you live in a flat/maisonette, listed building, or a conservation area, planning permission or listed building consent may be required, especially if the changes affect the external appearance.
Read more about planning permission for windows and doors for houses
Read about planning permission for windows and doors for flats and maisonettes
The failure to obtain planning permission or comply with the details of a permission is commonly known as a 'planning breach'.
A planning breach usually occurs when:
- A development that requires planning permission is undertaken without the permission being granted - either because the planning application was refused or was never applied for
- A development that has been given permission subject to conditions breaks one or more of those conditions.
If the breach involves a previously rejected development (or the retrospective application fails) the council can issue an enforcement notice requiring you to put things back as they were.
There are statutory time limits for enforcement, these vary based on when the breach took place.
If the breach took place prior to 25 April 2024
- Change of use of a building, or part of a building, to use as a single dwelling house - Enforcement action can no longer be taken once the unauthorised use has continued for four years without any enforcement action being taken
- Operational development relating to building, engineering or mining - Enforcement action can no longer be taken from four years, beginning the date where the operations were substantially completed.
If the breach took place on or after 25 April 2024
- Change of use of a building, or part of a building, to use as a single dwelling house - Enforcement action can no longer be taken once the unauthorised use has continued for ten years without any enforcement action being taken
- Operational development relating to building, engineering or mining - Enforcement action can no longer be taken from ten years, beginning the date where the operations were substantially completed.
Other time limits:
There is no time limit for enforcement on breaches of planning control relating to relevant demolition.
For any other breach of planning control, ten years beginning with the date of the breach. This predominantly applies to changes of use.
Read more about breaches of planning control and lawful development certificates on Planning Portal.
Whether you need building regulations approval depends on the type of underfloor heating (UFH) you are installing.
Electric UFH must comply with Part P for electrical safety.This work can be done by a member of the competent persons scheme who can self-certify the work.
Wet UFH must comply with Part L which focuses on the conservation of fuel and power. This will likely require building control approval.
The conversion of a garage, or part of a garage, into habitable space, will normally require approval under the building regulations.
As part of the garage conversion, it is likely that the original garage door will be in-filled with a new wall and possibly a window or door, and a new foundation may be needed for the new wall.
As well as the foundation, you also need to consider:
- Floor
- Walls
- Ventilation
Read more about the building regulations for garage conversions.
You may wish to make loft alterations to enhance the storage facilities available or to increase the living space of the home. Converting the loft of a house is considered to be permitted development (not requiring an application for planning permission) subject to certain limits and conditions.
Remember, building regulations approval is required to convert a loft or attic into a liveable space.
Find out about loft conversions
There are different rules for flats and maisonettes regarding loft conversions. Read guidance for converting the loft of a top floor flat.
Installing a new septic tank in your garden will often require both planning permission, building regulations approval and a septic tank permit.
The planning permission will ensure that the tank is installed in an appropriate location with information being provided to understand any potential implications for the surrounding environment and water.
Building regulations is required for the installation of a septic tank to ensure it meets the drainage and waste disposal standards set out in Approved Document H.
Where possible it is recommended that you connect to an existing public sewer instead of installing a septic tank, this reduces waste entering the waterways.
For more information visit our drains common project or contact your local planning authority.
Widening or creating a new external doorway will likely fall under permitted development rights, meaning an application for planning permission is not required provided you meet limits and conditions set out in legislation. If the change is on the side or rear of the building it is more likely to comply with planning regulations.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
New external doorways which create a new or widened opening must comply with building regulations as they may impact the structure of a building.
Planning permission is not required for the installation of a stair lift, however, if you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
Stairlifts must be installed in line with BS EN 81-40:2020 which focuses on safety requirements for the installation of stairlifts.
Running a taxi business from home will require planning permission as it constitutes a change of use of the property. The business may cause increased traffic or visitors, staff being in the property and external advertising, all of which would have an impact on the surrounding area.
You should contact your local planning authority or the Planning Guidance Service for more advice.
Normally planning permission is not required for installing a toilet in an existing area of the property as the change is only internal. If the toilet is part of a wider project such as an extension permission may be required.
If you live in a listed building, then listed building consent will be required for any major changes.
Building regulations will apply to the installation of a toilet in a property, these will cover areas such as ventilation, plumbing and drainage, and size.
Replacing the window within a bay window is treated the same as any other window. Meaning that the replacement of windows which have a similar appearance to those previously used would not require an application for planning permission.
Repairs, maintenance and minor improvements will also not require an application.
If you live in a listed building or a designated area then different rules may apply.
For more details on replacing windows, visit our common projects section.
You can usually put up new fences, gates or garden walls without planning permission, as long as you stay within permitted height limits. If the structure is adjacent to a highway (including footpaths), it must not exceed one metre in height. For all other boundaries, the maximum permitted height is two metres. Anything taller than these limits will require planning permission.
If the garage will remain in domestic use - for example, as a personal hobby or home workshop - then planning permission is typically not required.
However, it’s important to check whether there are any planning conditions, covenants, or restrictions attached to your property or the garage itself that may limit or prevent conversion.
Read about planning permission for garage conversions on Planning Portal.
If you plan to put up a small, detached building like a garden shed, garden room, garden office, annexe or summerhouse (all classed as outbuildings), building regulations generally won’t apply if the building has a floor area under 15 square metres and does not include any sleeping accommodation.
For buildings with a floor area between 15 and 30 square metres, building regulations approval is usually not needed - as long as the building does not include sleeping accommodation and either:
- it is at least one metre away from any boundary, or
- it is built mainly from non-combustible materials.
Read more about the building regulations that apply to outbuildings.
Don't forget to check the permitted development rights for outbuildings.
Your planning application must be made up of:
- The necessary plans of the site
- The required supporting documentation
- The completed form
- The correct fee.
The local planning authority will not be able to process your application unless the mandatory supporting documentation has been provided. You can also attach any other relevant documentation which you think will help the local authority determine the application.
What supporting documentation must be provided depends on the application type, development type and local planning authority.
There are two levels of mandatory documents, national and local. If you’re applying online, the service will tell you what mandatory documentation you need to provide and allows you to attach the relevant documents. Most applications will require you to provide a location plan and a site plan.
In addition to the national list, your LPA may produce a list which details any specific documentation that is required to accompany the application. The requirements may vary according to the type of application, i.e. household, full, outline, etc. If you are applying online, this list is available from the supporting documents screen or your local planning authority’s website.
For more information around what to submit visit the how to apply section on Planning Portal.
If you do not seek planning permission, build without it when it applies, or do not meet specified conditions of a planning permission, this is known as a planning breach.
Your local planning authority can serve an enforcement notice on you when they consider you have broken planning rules. You may be given the opportunity to apply retrospectively, or be required to remove a building or structure, or alter it to make it acceptable.
If you want formal confirmation that the existing use of a building is lawful for planning purposes, or that your proposed development does not require planning permission, you can apply for a Lawful Development Certificate(LDC). An LDC can be useful in situations where you need assurance that a particular use, operation, or development is lawful under planning legislation.
Read more about Lawful Development Certificates.
Applications for a Lawful Development Certificate can be submitted online to your local council using Planning Portal. You must include enough detail and evidence to support your case; if the information is insufficient, your application may be refused.
There is no single legal definition of "habitable room", as its use and meaning are subject to context. Generally, a habitable room is a space in a building that is designed for people to live, sleep, or spend extended periods of time in, but does not include bath or toilet facilities, corridors or utility rooms.
Research indicates that more than half of the population would like to build their own home at some point in their lives. While it is a significant commitment that demands time and dedication, the reward is a home designed specifically to suit your needs and lifestyle.
As part of the self-build journey you will have to consider many factors including:
- Finance
- Location and acquiring land
- Modular homes
- Planning permission.
Read detailed guidance about self-build homes on Planning Portal
If you carry out development without the necessary planning permission, and it doesn’t fall within permitted development rights, you may be in breach of the planning rules. In such cases, you will usually need to submit a retrospective planning application to seek approval for the work already completed or started. However, there is no guarantee that permission will be granted.
Learn more about planning breaches on Planning Portal
Whether you need planning permission to install an extractor fan depends on the size and placement of the fan.
For domestic installations, such as a bathroom or kitchen in your house, planning permission is not generally required. If the change significantly alters the external appearance of your home then permission may be required.
If you live in a listed building, you will need listed building consent for any significant changes.
Larger extractor fans for businesses are likely to require an application for planning permission to be made to the local planning authority. These extractors can impact the local area due to their noise, visibility and odour, as such the planning authority will need to assess the change.
Building regulations relating to ventilation and electrical works will have to be complied with, these are covered by Approved Document F and P respectively.
Read more about building regulations and the requirement for ventilation on our common projects.
The UK Government provide access to public land records, allowing you to check certain restrictions on land. You can use the online tool to check whether your land is in a conservation area.
VisitGOV.UK and use the planning data map.
(This map covers planning data for England).
If you are unsure you should contact your local planning authority.
A council’s planning department, known as the local planning authority (LPA), is the local government body responsible for managing and overseeing the planning system in a specific area.
You can use the search tool on Planning Portal to find the contact details for any local planning authority in England and Wales.
A wall is a 'party wall' if it stands astride the boundary of land belonging to two (or more) different owners, for example the wall separating two semi-detached properties.
Some kinds of work carried out to a property may not be controlled by the building regulations, but may be work which is covered by the Party Wall etc. Act 1996. This is a separate piece of legislation with different requirements to the building regulations.
To find out more about party walls, visit Planning Portal.
Yes, in most cases you can use an outbuilding as a home office without needing planning permission. As long as the use remains incidental to the main dwelling it is still considered part of your domestic residential use.
When you, or an agent acting on your behalf, have submitted a planning application, the local authority will firstly check the application to check if it’s complete. This validation process allows the authority to ensure everything that is required to decide an application has been received and provided correctly. They will contact you if they require any further information from you.
After the application has been validated, the determination process begins and takes up to 8 weeks for smaller applications, or up to 13 weeks for larger applications. The authority should be able to give you an idea about the likely timetable. The local authority will contact you with their decision.
Read more about the decision-making process for planning applications.
Many trees are protected by Tree Preservation Orders (TPO) which means that, in general, you need the council's consent to prune or fell them.
A TPO is placed on a tree, group of trees or woodland with the aim of protecting them. The following is prohibited on a protected tree, without the local planning authority's (LPA) consent:
- Felling
- Topping
- Lopping
- Uprooting
- Wilful damage/destruction
Owners of the trees must maintain their trees, and an LPA will often encourage good tree management. However, they are unable to require maintenance work just because a tree falls under a TPO.
If you wish to complete work on a tree under a TPO you will be required to submit an application to the local planning authority. For full details on this application type, read guidance about works to trees and the application process.
Approved Documents are official guides that explain how to comply with the building regulations. Published by the government, each document provides practical guidance on meeting the requirements of a specific ‘Part’ of the regulations. They cover a wide range of building work, including plumbing, electrical installations, extensions and ventilation.
The latest versions of the Approved Documents, which support the technical ‘Parts’ of the building regulations, along with Regulation 7, are available on Planning Portal.
Categorising land and buildings according to their type and purpose is known as Use Classes.
A 'Change of use' can be within the same Use Class or from one Use Class to another.
You will need planning permission for certain changes to the use of a property such as changing from a residential use to a business use. However, it is possible to change use between some classes without having to make an application for planning permission.
Depending on the specifics of any proposed change of use, including any building work associated with the proposal, an application for planning permission or prior approval may be required.
If your proposal for planning permission or building regulations approval is solely for extensions or alterations to a disabled person’s house to improve access, safety or comfort then you are exempt from paying a planning or building control fee. Additionally, if you are providing means of access for disabled persons to public buildings you are exempt from any fee.
Note that for building regulations approval, you will only be exempt when applying to a local authority building control body.
Significant changes to insulation and thermal elements would normally require building regulations approval. The extent to which this applies depends on the existing insulation and what it will be replaced with.
If the work is completed by a member of a competent persons scheme, then an application for approval will not be required.
Find out more about insulation and building regulations on our common projects.
Bricking up or infilling an existing window is classified as permitted development, meaning an application for planning permission is not required to complete the works. You will need to ensure that any materials used are of a similar appearance to the existing exterior of the house.
If you live in a listed building, then you will require planning permission and listed building consent for the change. In this instance it is best practice to talk to your local planning authority first.
You likely will require advertisement consent to display a commercial advertisement outside your home, especially when the company does not operate from that location.
It is more likely that permission will be required where:
- the sign is over 0.3 square metres or illuminated
- the sign is visible from a road
- the building is listed or in a designated area then consent
Find out more about advertisement consent on Planning Portal.
A roof window (or skylight) is fitted flush within the slope of a roof, while a dormer projects outward, creating additional headroom and floor space.
Both can be installed under permitted development but must meet specific size and position limits to qualify.
Also consider building regulations for a new dormer, find out more on Planning Portal
You will often not require planning permission to fit a log burner. If you are adding a new external flue or chimney then different rules will apply.
If you live in a listed building you will require listed building consent.
The installation of a log burner must comply with building regulations. It is recommended that you use a HETAS-registered installer who can certify the work. Visit the HETAS website to search for an installer.
Read more information around fitting an external flue or chimney in our common projects section.
Inserting new windows which look similar to those previously used in the house will often not require planning permission. Some rules apply to new additions, for example if they are on an upper-floor side elevation they must be obscure glazed and non-opening or more than 1.7 metres above the floor.
Installing a new bay window on the front elevation would require planning permission as it is classed as a forward extension.
If you live in a listed building or conservation area you should contact your local planning authority.
Any new openings will have to comply with building regulations, this may impact thermal heat loss, structure, ventilation and fire safety.
You can use a member of a competent person scheme to complete any work, this will ensure that the work is completed in-line with regulations.
Adding an internal wall will not require planning permission or building control approval in most cases. If the building is listed, then you may require listed building consent to make a major alteration to the house.
Any work completed should adhere to building regulations, ensuring fire routes, electrics and ventilation are considered.
Fitting, altering or replacing an external flue, chimney, or soil and vent pipe is normally considered to be permitted development, not requiring an application for planning permission, providing certain conditions are met.
Read about the conditions which must be met to comply with permitted development rules.
Building regulations apply to installing a flue, and installation should be carried out by a suitably qualified installer.
Read about building regulations for flue installation.
Work to the roof of a house (e.g. re-roofing) that does not change its external appearance will usually not require an application planning permission as it is classed as ‘permitted development’. There are certain conditions and limits that need to be met to qualify for permitted development rights.
Read more about permitted development for work to a roof.
A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated.