Smart Search Beta
Our Smart Search beta learns and improves with every search.
Enter a keyword to find planning and building information.
By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.
There are different planning fees for England and Wales, and many different application types depending on the work being carried out.
You can use the Planning Portal's fee calculator to work out fees for different kinds of proposal.
Use the fee calculator (England)
Use the fee calculator (Wales)
While every effort has been taken to ensure that the fee has been calculated correctly, the determination of whether a planning fee is correct is the responsibility of the relevant local planning authority, who will check the fee is correct when the application is submitted and validated.
Research indicates that more than half of the population would like to build their own home at some point in their lives. While it is a significant commitment that demands time and dedication, the reward is a home designed specifically to suit your needs and lifestyle.
As part of the self-build journey you will have to consider many factors including:
- Finance
- Location and acquiring land
- Modular homes
- Planning permission.
Read detailed guidance about self-build homes on Planning Portal
Widening or creating a new external doorway will likely fall under permitted development rights, meaning an application for planning permission is not required provided you meet limits and conditions set out in legislation. If the change is on the side or rear of the building it is more likely to comply with planning regulations.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
New external doorways which create a new or widened opening must comply with building regulations as they may impact the structure of a building.
The conversion of a garage, or part of a garage, into habitable space, will normally require approval under the building regulations.
As part of the garage conversion, it is likely that the original garage door will be in-filled with a new wall and possibly a window or door, and a new foundation may be needed for the new wall.
As well as the foundation, you also need to consider:
- Floor
- Walls
- Ventilation
Read more about the building regulations for garage conversions.
The UK Government provide access to public land records, allowing you to check certain restrictions on land. You can use the online tool to check whether your land is in a conservation area.
VisitGOV.UK and use the planning data map.
(This map covers planning data for England).
If you are unsure you should contact your local planning authority.
Work to the roof of a house (e.g. re-roofing) that does not change its external appearance will usually not require an application planning permission as it is classed as ‘permitted development’. There are certain conditions and limits that need to be met to qualify for permitted development rights.
Read more about permitted development for work to a roof.
A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated.
Planning permission is not required for moving internal walls in a flat.If the building is a listed building, you may require listed building consent.
Removing a load bearing wall will require building control approval as it is altering the structure of the property. You will be required to provide a report from a structural engineer who will provide structural calculations.
Work on internal walls may also affect fire escape routes, ventilation, drainage or electrics. These should be considered during the design process and work should be carried out by a member of the competent person scheme where possible.
A shed is classed as an outbuilding which falls under permitted development rights, meaning that it does not require an application for planning permission. They can be built in conservation areas provided they meet the limits set out in legislation.
Specifically on protected land, including conservation areas, no part of the outbuilding can be on the side or front elevation of the house.
A full list of limits and conditions can be read on our outbuildings common project.
Replacing existing render on the outside of your house with render of a similar appearance will not require planning permission as it is considered permitted development.
If you are changing the external appearance of the house or in a protected area such as a conservation area, then planning permission will be required. The external appearance of the house is likely to be changed when you are rending the house for a first time or changing the type or colour of the render.
If the building is listed, then you will need listed building consent.
Common Questions
Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.
Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.
To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres.
Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.
If you live in a listed building you will require listed building consent for any major works to the property.
In many cases, yes. Converting a single residential property (Class C3) into a small House in Multiple Occupation (HMO) for up to six occupants can often be done under permitted development rights, specifically under Class L. This means that planning permission isn’t usually required.
However, if your property is located in an area covered by an Article 4 Direction, permitted development rights are removed, and you would need to apply for full planning permission to change the use from C3 (dwellinghouse) to C4 (HMO).
Read more information about use class changes on Planning Portal
Yes, but this type of conversion will require full planning permission. This is because you’d be changing the use of the ground floor from residential to commercial (typically to a use class such as E), while the upper floor would remain as a residential flat (Class C3). The change of use triggers the need for planning approval.
Find out more about change of use
Yes, but you will need to obtain planning permission. Converting a detached garage into a self-contained living space, such as annexe, studio flat, or retail unit, represents a material change of use, particularly if it will function independently from the main house. This is because the garage would no longer be used in connection with the main dwelling and would effectively become a separate residential unit.
You may wish to make loft alterations to enhance the storage facilities available or to increase the living space of the home. Converting the loft of a house is considered to be permitted development (not requiring an application for planning permission) subject to certain limits and conditions.
Remember, building regulations approval is required to convert a loft or attic into a liveable space.
Find out about loft conversions
There are different rules for flats and maisonettes regarding loft conversions. Read guidance for converting the loft of a top floor flat.

