Smart Search Beta

Our Smart Search beta learns and improves with every search.

Enter a keyword to find planning and building information.

What is an improvement notice?

An improvement notice is a notice served by a local authority requiring a property owner to carry out specified works to bring a building into compliance with the legal standards. These are most commonly served to landlords to make a building safe.

The notice will specify what works should be completed and when it should begin and be completed by.

Failure to comply with an improvement notice is a criminal offence.

Flat
House
Building regulations
What is permitted development?

Permitted development rights allow certain types of work to be carried out without the need to apply for planning permission. It typically covers things like small extensions, loft conversions and outbuildings, provided they meet specific size and location limits. These rights can vary or be removed in areas like conservation zones and by Article 4’s, so it’s best to check before proceeding.  

Read about permitted development and Article 4 directions on Planning Portal

Flat
House
Planning
What is prior approval?

Certain types of development are granted planning permission by national legislation without the need to submit a planning application. This is known as 'permitted development'. In order to be eligible for these permitted development rights, each 'class' specified in the legislation has associated limitations and conditions that proposals must comply with.

One such condition on certain classes of permitted development is the need to submit an application to the local planning authority for its 'prior approval; or to determine if it’s 'prior approval' will be required.

This allows the local planning authority to consider the proposals, their likely impacts in regard to certain specific factors (e.g. transport and highways) and how these may be mitigated.

For more information on prior approval, read guidance on prior approval consent types.

Planning permission
What is the 10-year rule for planning enforcement?

The failure to obtain planning permission or comply with the details of a permission is commonly known as a 'planning breach'.

A planning breach usually occurs when:

  • A development that requires planning permission is undertaken without the permission being granted - either because the planning application was refused or was never applied for
  • A development that has been given permission subject to conditions breaks one or more of those conditions.

If the breach involves a previously rejected development (or the retrospective application fails) the council can issue an enforcement notice requiring you to put things back as they were.

There are statutory time limits for enforcement, these vary based on when the breach took place.

If the breach took place prior to 25 April 2024
  • Change of use of a building, or part of a building, to use as a single dwelling house - Enforcement action can no longer be taken once the unauthorised use has continued for four years without any enforcement action being taken
  • Operational development relating to building, engineering or mining - Enforcement action can no longer be taken from four years, beginning the date where the operations were substantially completed.
If the breach took place on or after 25 April 2024
  • Change of use of a building, or part of a building, to use as a single dwelling house - Enforcement action can no longer be taken once the unauthorised use has continued for ten years without any enforcement action being taken
  • Operational development relating to building, engineering or mining - Enforcement action can no longer be taken from ten years, beginning the date where the operations were substantially completed.
Other time limits:

There is no time limit for enforcement on breaches of planning control relating to relevant demolition.

For any other breach of planning control, ten years beginning with the date of the breach. This predominantly applies to changes of use.

Read more about breaches of planning control and lawful development certificates on Planning Portal.

Planning permission
What is the difference between a roof window and a dormer window?

A roof window (or skylight) is fitted flush within the slope of a roof, while a dormer projects outward, creating additional headroom and floor space.  

Both can be installed under permitted development but must meet specific size and position limits to qualify.  

Also consider building regulations for a new dormer, find out more on Planning Portal  

House
Flat
Loft conversion
Roof window
Planning
What is the process for applying for planning permission?

When you, or an agent acting on your behalf, have submitted a planning application, the local authority will firstly check the application to check if it’s complete. This validation process allows the authority to ensure everything that is required to decide an application has been received and provided correctly. They will contact you if they require any further information from you.

After the application has been validated, the determination process begins and takes up to 8 weeks for smaller applications, or up to 13 weeks for larger applications. The authority should be able to give you an idea about the likely timetable. The local authority will contact you with their decision.

Read more about the decision-making process for planning applications.

Planning
What is the ‘principal elevation’?

The principal elevation is the most visible or prominent side of a structure, typically facing a street or public area. While often considered the 'front' of the building, it may not always contain the main entrance. There can only be one principal elevation of a house.

Planning
What permission do I need to knock through adjoining properties?

Planning permission is not normally required to turn two properties into one by knocking through a party wall provided the changes are internal and do not impact the external appearance of the property.

You should check with your local planning authority that they agree, and there are not any previous planning changes or conditions which may have an impact.

Additional permissions may be required depending on the building’s history and their location. If the building is listed, an application for listed building consent will be required before any major changes are made to the dwellings.

The work will have to comply with building regulations, the focus will be on structural work and safety.

Read more about how building regulations apply to internal walls.

Internal walls
What permission is required to build a lean-to at the side of my house?

Whether a lean-to requires planning permission will depend on what the lean-to is used for, it may be an extension, pergola, carport, conservatory or gazebo.

In some cases a building a lean-to will be classified as permitted development, meaning an application for planning permission is not required provided specified limits and conditions are met. If these are exceeded, then you must apply for planning permission.

Permitted development rules vary based on the type of work you are completing, visit our Mini Guides for details on the specific rules.

If you live in a listed building, you will need listed building consent for any significant changes.

Extension
Outbuilding
What permissions are needed, or regulations need to be met to install a stair lift?

Planning permission is not required for the installation of a stair lift, however, if you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.

Stairlifts must be installed in line with BS EN 81-40:2020 which focuses on safety requirements for the installation of stairlifts.

Accessibility
Stairs
Featured
Type
Clear
Clear All
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Common Questions

Can I build a two-storey extension without planning permission?

Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.

Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.

To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres. 

Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.

If you live in a listed building you will require listed building consent for any major works to the property.

Extension
House
Planning
Can I change my house into a shared house for students (HMO)?

In many cases, yes. Converting a single residential property (Class C3) into a small House in Multiple Occupation (HMO) for up to six occupants can often be done under permitted development rights, specifically under Class L. This means that planning permission isn’t usually required.

However, if your property is located in an area covered by an Article 4 Direction, permitted development rights are removed, and you would need to apply for full planning permission to change the use from C3 (dwellinghouse) to C4 (HMO).  

Read more information about use class changes on Planning Portal

House
Flat
Planning
Can I change my house to a shop with a flat above?

Yes, but this type of conversion will require full planning permission. This is because you’d be changing the use of the ground floor from residential to commercial (typically to a use class such as E), while the upper floor would remain as a residential flat (Class C3). The change of use triggers the need for planning approval.  

Find out more about change of use

House
Shop
Flat
Planning
Can I convert a detached garage into a self-contained living space?

Yes, but you will need to obtain planning permission. Converting a detached garage into a self-contained living space, such as annexe, studio flat, or retail unit, represents a material change of use, particularly if it will function independently from the main house. This is because the garage would no longer be used in connection with the main dwelling and would effectively become a separate residential unit.

Flat
House
Garage
Planning
Can I convert my loft into a liveable space?

You may wish to make loft alterations to enhance the storage facilities available or to increase the living space of the home. Converting the loft of a house is considered to be permitted development (not requiring an application for planning permission) subject to certain limits and conditions.

Remember, building regulations approval is required to convert a loft or attic into a liveable space.

Find out about loft conversions

There are different rules for flats and maisonettes regarding loft conversions. Read guidance for converting the loft of a top floor flat.

House
Terrace
Inside
Loft conversion
Dormer window

Ask another question

Can’t find what you’re looking for?

Propose a question to help us make Smart Search even smarter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.