Foundations are required to carry and distribute the load of the building safely. Therefore, all buildings should have adequate foundations. The factors that need to be considered when designing a foundation are:
It is advisable to contact a structural engineer or speak to a building control body about plans for new foundations.
Read more about foundations for extensions
An application for full planning permission for a change of use is often required when changing from a house (use class C3) to a residential institution (use class C2). This is due to the increased activity which a C2 use would have on the local street area through the addition of visitors, staff and changes to parking.
Read additional information on use classes and changes of use.
Once submitted, your planning application first goes through a validation process. After its validated, the formal decision period is 8 weeks. However, in some cases, especially for more complex proposals or if further information is needed, your local authority may request an extension of time.
Understand more about the decision-making process on Planning Portal
A dropped kerb is a sloping point in the pavement to provide access by vehicle to a property. Dropped kerbs aren’t usually a planning matter although it is recommended that you contact your local authority to find out if planning permission is required, and you will need to make a specific dropped kerb application for a domestic vehicle crossing licence to your local authority.
Work to create a dropped kerb must be carried out by a New Roads and Street Works Act accredited contractor.
There are different planning fees for England and Wales, and many different application types depending on the work being carried out.
You can use the Planning Portal's fee calculator to work out fees for different kinds of proposal.
Use the fee calculator (England)
Use the fee calculator (Wales)
While every effort has been taken to ensure that the fee has been calculated correctly, the determination of whether a planning fee is correct is the responsibility of the relevant local planning authority, who will check the fee is correct when the application is submitted and validated.
The principal elevation is the most visible or prominent side of a structure, typically facing a street or public area. While often considered the 'front' of the building, it may not always contain the main entrance. There can only be one principal elevation of a house.