Foundations are required to carry and distribute the load of the building safely. Therefore, all buildings should have adequate foundations. The factors that need to be considered when designing a foundation are:
It is advisable to contact a structural engineer or speak to a building control body about plans for new foundations.
Demolishing and building a new lean-to will still have comply with planning requirements.
If you live in a conservation area or listed building you may require approval for the demolition.
Whether a lean-to requires planning permission will depend on what the lean-to is used for, it may be an extension, pergola, carport, conservatory or gazebo.
In some cases a building a lean-to will be classified as permitted development, meaning an application for planning permission is not required provided specified limits and conditions are met. If these are exceeded, then you must apply for planning permission.
Permitted development rules vary based on the type of work you are completing, visit our interactive house mini guides for details on the specific rules.
If you live in a listed building, you will need listed building consent for any significant changes.
Adding air conditioning to your home may be considered permitted development provided all the limits and conditions set out in legislation are met. The limits set out the function, size, placement and quantity of air conditioning units allowed.
The rights only apply if the system provides a heating function (including if it can provide both heating and cooling). If the system only offers a cooling function, then the rights do not apply and an application for planning permission will be required.
If your home is in a protected area such as a Conservation Area then permission will be required. If you live in a listed building then consent will be required.
The installation of air conditioning must comply with building regulations. It is advisable to contact an installer who can provide the necessary advice, preferably one who belongs to either the Microgeneration Certification Scheme or the relevant Competent Person Scheme.
For more information on air conditioning, read our heat pumps common project.
Under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), you have a general permission to install an antenna up to a specific size on property without the need for planning permission. This general permission depends on your house type and area. Your local planning authority can give you more advice.
Your planning application must be made up of:
The local planning authority will not be able to process your application unless the mandatory supporting documentation has been provided. You can also attach any other relevant documentation which you think will help the local authority determine the application.
What supporting documentation must be provided depends on the application type, development type and local planning authority.
There are two levels of mandatory documents, national and local. If you’re applying online, the service will tell you what mandatory documentation you need to provide and allows you to attach the relevant documents. Most applications will require you to provide a location plan and a site plan.
In addition to the national list, your LPA may produce a list which details any specific documentation that is required to accompany the application. The requirements may vary according to the type of application, i.e. household, full, outline, etc. If you are applying online, this list is available from the supporting documents screen or your local planning authority’s website.
For more information around what to submit visit the how to apply section on Planning Portal.
Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.
Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.
To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres.
Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.
If you live in a listed building you will require listed building consent for any major works to the property.