Foundations are required to carry and distribute the load of the building safely. Therefore, all buildings should have adequate foundations. The factors that need to be considered when designing a foundation are:
It is advisable to contact a structural engineer or speak to a building control body about plans for new foundations.
Work to the roof of a house (e.g. re-roofing) that does not change its external appearance will usually not require an application planning permission as it is classed as ‘permitted development’. There are certain conditions and limits that need to be met to qualify for permitted development rights.
Read more about permitted development for work to a roof.
A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated.
In many circumstances, rules known as ‘permitted development’ rights allow you to extend a house without needing to apply for planning permission, providing specific limitations and conditions are met. If you want to exceed these limits and conditions, then it is likely that an application for householder planning permission will be required.
You can find information about the limits and conditions, prior approval and the building regulations on the Planning Portal by using the links below.
Read about planning permission for extensions
Read about prior approval for larger single storey extensions
Find out about building regulations for an extension
A bin store is classed as an outbuilding, these fall under permitted development rules meaning they are allowed as long as they adhere to a set list of rules. However, one of these rules is that outbuildings cannot be placed in front of the principal elevation*. As such, you will be required to apply for planning permission to build a bin store or any permanent structure in your front garden.
Read more about the rules for outbuildings.
Principal elevation - The most visible or prominent side of a structure, typically facing a street or public area. While often considered the 'front' of the building, it may not always contain the main entrance.
A soakaway does not normally require an application for planning permission provided it deals with surface water and does not discharge into a public sewer. Additional regulations may apply if you are in a conservation area or within the boundary of a listed building.
Building regulations will apply to the creation of a soakaway. The soakaway must comply with Part H of the building regulations which specifies where they can be located and the size that is permitted.
Read more about Approved Document H.
By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.