Want to learn everything about Webflow? Download our free eBook today.
Widening or creating a new external doorway will likely fall under permitted development rights, meaning an application for planning permission is not required provided you meet limits and conditions set out in legislation. If the change is on the side or rear of the building it is more likely to comply with planning regulations.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
New external doorways which create a new or widened opening must comply with building regulations as they may impact the structure of a building.
Building a porch at ground level and under 30 square metres in floor area is normally exempt from the need for building regulations approval.
This is provided that glazing and any fixed electrical installations comply with the appropriate sections of building regulations.
To find out more about the building regulations for porches, visit Planning Portal.
Find out more about glazing and electrical installations
Normally planning permission is not required for installing a toilet in an existing area of the property as the change is only internal. If the toilet is part of a wider project such as an extension permission may be required.
If you live in a listed building, then listed building consent will be required for any major changes.
Building regulations will apply to the installation of a toilet in a property, these will cover areas such as ventilation, plumbing and drainage, and size.
By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.
Yes, but you will need to obtain planning permission. Converting a detached garage into a self-contained living space, such as annexe, studio flat, or retail unit, represents a material change of use, particularly if it will function independently from the main house. This is because the garage would no longer be used in connection with the main dwelling and would effectively become a separate residential unit.
Work that requires building control approval will require a completion notice to be submitted to the building control body. The completion notice must be sent within five days of the work being completed, once submitted, the building control body can visit the site to complete a final inspection.
If the work meets the required standards they will issue a completion certificate.