Planning permission is not required if the home will be used as a short-term let for 90 days or less throughout the year.
If you plan on using the home as a short-term let for more than this time period, then you will need to apply for planning permission for a change of use.
If you rent a room in your property while you still live there, you will not require planning permission.
Adding a permanent wheelchair ramp for access to a home is likely to require planning permission as it will permanently change the external appearance of the front of the house. If the application is solely for improving disable access to the building then the planning application will be exempt from a planning fee.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
All permanent wheelchair ramps must comply with Approved Document M of the building regulations which specifies the gradient, width and surfaces which should be used.
Adding air conditioning to your home may be considered permitted development provided all the limits and conditions set out in legislation are met. The limits set out the function, size, placement and quantity of air conditioning units allowed.
The rights only apply if the system provides a heating function (including if it can provide both heating and cooling). If the system only offers a cooling function, then the rights do not apply and an application for planning permission will be required.
If your home is in a protected area such as a Conservation Area then permission will be required. If you live in a listed building then consent will be required.
The installation of air conditioning must comply with building regulations. It is advisable to contact an installer who can provide the necessary advice, preferably one who belongs to either the Microgeneration Certification Scheme or the relevant Competent Person Scheme.
For more information on air conditioning, read our heat pumps common project.
Work that requires building control approval will require a completion notice to be submitted to the building control body. The completion notice must be sent within five days of the work being completed, once submitted, the building control body can visit the site to complete a final inspection.
If the work meets the required standards they will issue a completion certificate.
Land and buildings are categorised by their type and purpose through a system known as ‘use classes’. A 'Change of use' can be within the same Use Class or from one Use Class to another.
You can find a full list of use classes and change of use scenarios related to planning on the Planning Portal website.
Installing a new septic tank in your garden will often require both planning permission, building regulations approval and a septic tank permit.
The planning permission will ensure that the tank is installed in an appropriate location with information being provided to understand any potential implications for the surrounding environment and water.
Building regulations is required for the installation of a septic tank to ensure it meets the drainage and waste disposal standards set out in Approved Document H.
Where possible it is recommended that you connect to an existing public sewer instead of installing a septic tank, this reduces waste entering the waterways.
For more information visit our drains common project or contact your local planning authority.