Do I need planning permission to build underground?

Creating a new basement will usually require planning permission, particularly if it affects the external appearance of the property. For example, installing a lightwell to bring natural light into the basement may be subject to stricter design rules if it is visible from the street, especially at the front of the property, compared to those at the rear or side.

Because basement construction involves significant excavation and structural work, permission is often necessary. It’s recommended that you consult your local planning authority early on to understand what is likely to be considered acceptable before submitting a planning application. Building regulations will also apply to a new or conversion of a basement.

Read further guidance on basements.

Common Questions

Can I build a two-storey extension without planning permission?

Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.

Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.

To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres. 

Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.

If you live in a listed building you will require listed building consent for any major works to the property.

What size extension can I build without planning permission?

In many circumstances, rules known as ‘permitted development’ rights allow you to extend a house without needing to apply for planning permission, providing specific limitations and conditions are met. If you want to exceed these limits and conditions, then it is likely that an application for householder planning permission will be required.

You can find information about the limits and conditions, prior approval and the building regulations on the Planning Portal by using the links below.  

Read about planning permission for extensions

Read about prior approval for larger single storey extensions

Find out about building regulations for an extension

What are the planning and building rules for constructing a soakaway?

A soakaway does not normally require an application for planning permission provided it deals with surface water and does not discharge into a public sewer. Additional regulations may apply if you are in a conservation area or within the boundary of a listed building.

Building regulations will apply to the creation of a soakaway. The soakaway must comply with Part H of the building regulations which specifies where they can be located and the size that is permitted.

Read more about Approved Document H.

Do I need planning permission to add a first-floor extension onto an existing ground floor extension?

Adding a storey on top of an extension will always require an application for planning permission.

If you want to add a storey on top of your house under permitted development rights, it must be on the principal part of the house.

If you want to add an additional storey on top of your house, it can be permitted development. It is only permitted development if it follows certain rules:

The current house

  • Is not a building containing one or more flats, or a flat contained within such a building
  • Was constructed between 1 July 1948 and 28 October 2018
  • Has not already had additional storeys added to it
  • Is not on Article 2(3) land or a site of special scientific interest
  • Was not changed to be used as a house (from a previous non-residential use) under permitted development rights.

How many storeys can you add?

  • If the house is one storey then one storey can be added
  • If the house is two or more storeys then two storeys can be added

Where can the storeys be added?

  • The additional storeys must be added to the principal part of the house. The principal part of the house is the main part of the house excluding any front, side or rear extension of a lower height (regardless of these being part of the original house or subsequent additions).
  • Engineering operations must only include works within the existing curtilage of the house to strengthen existing walls and foundations

How high can it be?

  • The house cannot exceed 18 metres in total height
  • Each storey cannot add more than 3.5 metres to the total height
  • If the house is not detached the total height cannot be more than 3.5 metres higher than the next highest building that the house is attached to, adjoins, or is in the same row as.
  • The additional storeys must have an internal floor-to-ceiling height of no more than 3 metres, and no greater than the internal height of any existing storey within the principal part of the house.

What materials can be used?

The materials used must be of a similar appearance to those used in the construction of the exterior of the current house

Where can windows be placed?

Windows must not be placed in any wall or roof slope forming a side elevation of the house.

Following completion of development:

  • The house must remain in use as a domestic residential property
  • No visible support structures must remain on or attached to the exterior of the house
  • The roof pitch of the principal part of the house must be the same as it was prior to the development.

 If any of the limits set out above are exceeded then an application for planning permission will be required. If you are unsure, you should contact your local planning authority.

Find contact details for your local planning authority.

Can I install patio doors to the rear of my house where there is currently a single external door?

Installing patio doors at the rear of your house is likely to fall under permitted development rights, meaning an application for planning permission is not required, provided certain limits and conditions are met.

The doors should be of similar appearance to those previously used, if they are not then generally planning permission will be required.

If you live in a listed building, you will need listed building consent for any significant works.
If you live in a designated area such as a conservation area or national park, then additional restrictions may be in place.

If you are unsure whether the work falls within permitted development rights you can check with your local planning authority or submit a lawful development certificate to prove the change is lawful and prevent any future enforcement action.

Ask another question

Can’t find what you’re looking for?

Propose a question to help us make Smart Search even smarter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.