Planning permission may be required for external insulation if it impacts the external appearance of the building. If materials are of a similar appearance to those used in the construction of the house, then permission will likely not be required.
Listed buildings will require listed building consent for any significant work.
If you live in a Conservation Area or other protected area you will need to apply for planning permission before making changes to the outside of your house.
Further information and building regulations advice is available on Planning Portal. Read our external walls common project.
Installing a new septic tank in your garden will often require both planning permission, building regulations approval and a septic tank permit.
The planning permission will ensure that the tank is installed in an appropriate location with information being provided to understand any potential implications for the surrounding environment and water.
Building regulations is required for the installation of a septic tank to ensure it meets the drainage and waste disposal standards set out in Approved Document H.
Where possible it is recommended that you connect to an existing public sewer instead of installing a septic tank, this reduces waste entering the waterways.
For more information visit our drains common project or contact your local planning authority.
Adding a permanent wheelchair ramp for access to a home is likely to require planning permission as it will permanently change the external appearance of the front of the house. If the application is solely for improving disable access to the building then the planning application will be exempt from a planning fee.
If you live in a listed building, you will have to apply for listed building consent for any significant works, whether internal or external.
All permanent wheelchair ramps must comply with Approved Document M of the building regulations which specifies the gradient, width and surfaces which should be used.
By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.
Changing from a commercial use (use class E) to residential(use class C3) falls under permitted development rights, meaning an application for planning permission is not required.
To use the permitted development right you must meet the rules and regulations set out in legislation, this includes submitting an application for prior approval to the local planning authority. The full list of conditions is available on the government website, or our online application form will tell you whether you are eligible.
If you are not eligible for the permitted development right, you will have to submit an application for full planning permission.
Most garden ponds will fall under permitted development rights, meaning an application for planning permission is not required. In planning terms a pond will be classed as an outbuilding, to read the full rules around installing an outbuilding, visit our common projects section.
For ponds which are particularly deep or large, you may need to apply for planning permission. If you are unsure, you should contact your local planning authority for advice.
In a listed building you will require listed building consent for any major changes.
When installing a pond, you should take into account other regulatory considerations such as environmental permits or any protected species which may be impacted. Further thought will have to be placed when creating ponds near riverways or in areas of flood risk.