Feedback
Back arrow, pointing left

What is the difference between a roof window and a dormer window?

A roof window (or skylight) is fitted flush within the slope of a roof, while a dormer projects outward, creating additional headroom and floor space.  

Both can be installed under permitted development but must meet specific size and position limits to qualify.  

Also consider building regulations for a new dormer, find out more on Planning Portal  

Common Questions

What permissions do I need to install a hot tub in my garden?

You typically will not need planning permission to install a hot tub in your garden, as it is classed as an outbuilding and within the permitted development rights in terms of size and portability. However, you may need planning permission if you live in a listed building or conservation area, you should check first with your local authority.

The hot tub will need to adhere to the building regulations in terms of safe and adequate electrical installation by a registered competent person. Find out more about using a registered competent person.

Also, if the hot tub is placed within a building such as a large shed-style structure, there will be separate planning and building control limitations on that structure.

What are Approved Documents and where can I find them?

Approved Documents are official guides that explain how to comply with the building regulations. Published by the government, each document provides practical guidance on meeting the requirements of a specific ‘Part’ of the regulations. They cover a wide range of building work, including plumbing, electrical installations, extensions and ventilation.

The latest versions of the Approved Documents, which support the technical ‘Parts’ of the building regulations, along with Regulation 7, are available on Planning Portal.

Browse the Approved Documents.

Can I pave my front garden to use as a driveway?

You will not need planning permission if a new or replacement driveway of any size uses permeable (or porous) surfacing which allows water to drain through, or if the rainwater is directed to a lawn or border to drain naturally.

If the surface to be covered is more than five square metres planning permission will be needed for laying traditional, impermeable driveways that do not provide for the water to run to a permeable area.

This guidance applies to houses, there are different rules for flats and maisonettes, converted houses, new houses or areas where there permitted development rights may be restricted.

Read about paving your front garden

You may need to consider if a dropped kerb is required, largely dropped kerbs are not a planning matter but you will need to apply to your local council.  

Find out more about dropped kerbs

How do I apply for building regulations completion certificate?

Work that requires building control approval will require a completion notice to be submitted to the building control body. The completion notice must be sent within five days of the work being completed, once submitted, the building control body can visit the site to complete a final inspection.

If the work meets the required standards they will issue a completion certificate.

What is a ‘P certificate’ and how do I get one?

A ‘P certificate’ may refer to confirmation that electrical installations within a building are compliant with Approved Document P of the building regulations.

An electrician who is Part P certified is able to self-certify domestic work they complete, meaning you do not have to submit a building notice. To ensure your electrician is Part P certified, use a registered competent person.

Ask another question

Can’t find what you’re looking for?

Propose a question to help us make Smart Search even smarter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.