Planning permission is not required for moving internal walls in a flat.If the building is a listed building, you may require listed building consent.
Removing a load bearing wall will require building control approval as it is altering the structure of the property. You will be required to provide a report from a structural engineer who will provide structural calculations.
Work on internal walls may also affect fire escape routes, ventilation, drainage or electrics. These should be considered during the design process and work should be carried out by a member of the competent person scheme where possible.
If you do not seek planning permission, build without it when it applies, or do not meet specified conditions of a planning permission, this is known as a planning breach.
Your local planning authority can serve an enforcement notice on you when they consider you have broken planning rules. You may be given the opportunity to apply retrospectively, or be required to remove a building or structure, or alter it to make it acceptable.
In many cases, you can extend a house without applying for planning permission by using what's known as permitted development rights, provided certain limits and conditions are met. However, if your plans go beyond these restrictions, you will likely need to apply for householder planning permission.
Land and buildings are categorised by their type and purpose through a system known as ‘use classes’. A 'Change of use' can be within the same Use Class or from one Use Class to another.
You can find a full list of use classes and change of use scenarios related to planning on the Planning Portal website.
There is no single legal definition of "habitable room", as its use and meaning are subject to context. Generally, a habitable room is a space in a building that is designed for people to live, sleep, or spend extended periods of time in, but does not include bath or toilet facilities, corridors or utility rooms.
Once submitted, your planning application first goes through a validation process. After its validated, the formal decision period is 8 weeks. However, in some cases, especially for more complex proposals or if further information is needed, your local authority may request an extension of time.
Understand more about the decision-making process on Planning Portal