Is planning permission and building control approval required for removing internal walls in a flat?

Planning permission is not required for moving internal walls in a flat.If the building is a listed building, you may require listed building consent.

Removing a load bearing wall will require building control approval as it is altering the structure of the property. You will be required to provide a report from a structural engineer who will provide structural calculations.

Work on internal walls may also affect fire escape routes, ventilation, drainage or electrics. These should be considered during the design process and work should be carried out by a member of the competent person scheme where possible.

Common Questions

How can I find out if permitted development rights have been removed in my area?

National planning regulations allow certain alterations to be made to a property without requiring planning permission; these are known as permitted development rights. In some cases, local authorities may remove or restrict these rights for specific types of development that would otherwise be allowed. This is achieved through the use of Article 4 Directions, which are intended to protect the character, heritage, and appearance of designated areas.

If your local planning authority has issued an Article 4 Direction, some of your permitted development rights may no longer apply. As a result, you may need to submit a planning application for works that would not normally require one.

You can check whether an Article 4 Direction affects your property by visiting your local authority’s website.

Do I need planning permission or building control approval for damp proofing of external walls?

Planning permission is unlikely to be required for the installation of external damp proofing unless the work will change the external appearance of the building or is part of a larger project.

If you live in a listed building you will need listed building consent for any significant changes, this can include external damp proofing. Additional rules may also apply if you live in a Conservation Area or other protected area.

Building regulations approval is not required for installing an external damp proof course (DPC).

Read further guidance on damp proofing.

Do I need planning permission to add a children’s climbing frame in my front or back garden?

Climbing frames are classed as ‘outbuildings’ meaning they are classed as permitted development, not requiring an application provided they meet the limits set out in legislation. One of these limits is that they cannot be in front of the house.

The key restrictions for a climbing frame will be the height; how close it can be to the properties boundaries and where it can be located.

A full list of limits and conditions can be found on our outbuildings common projects.

If the climbing frame exceeds any of the limits set out in legislation an application for planning permission is required.

Can I convert my loft into a liveable space?

You may wish to make loft alterations to enhance the storage facilities available or to increase the living space of the home. Converting the loft of a house is considered to be permitted development (not requiring an application for planning permission) subject to certain limits and conditions.

Remember, building regulations approval is required to convert a loft or attic into a liveable space.

Find out about loft conversions

There are different rules for flats and maisonettes regarding loft conversions. Read guidance for converting the loft of a top floor flat.

What is the process for applying for planning permission?

When you, or an agent acting on your behalf, have submitted a planning application, the local authority will firstly check the application to check if it’s complete. This validation process allows the authority to ensure everything that is required to decide an application has been received and provided correctly. They will contact you if they require any further information from you.

After the application has been validated, the determination process begins and takes up to 8 weeks for smaller applications, or up to 13 weeks for larger applications. The authority should be able to give you an idea about the likely timetable. The local authority will contact you with their decision.

Read more about the decision-making process for planning applications.

Ask another question

Can’t find what you’re looking for?

Propose a question to help us make Smart Search even smarter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.