Do I need planning permission to extend my front porch to add a downstairs toilet?

It is likely that you will require planning permission to extend an existing front porch to add a toilet.

Adding a porch falls within permitted development rights meaning an application for planning permission is not required provided specified limits and conditions are met. However, to fall under permitted development rights for a porch, the total ground area must not exceed three square metres. This is unlikely to be enough room to fit toilet and the required additional components.

Read the full rules for porches under permitted development on our mini guides.

 

If your porch exceeds these limits, it will be classified as an extension. These can be permitted development but come with a different set of rules.

Extensions are not permitted development if they are built forward of the ‘principal elevation’ of the house. As such, you will be required to submit an application for planning permission to your local planning authority.

If you live in a listed building, you will need listed building consent for any significant changes.

‍

Common Questions

How long does planning permission last?

By law, any planning permission granted expires after a certain period. Generally, unless your permission says otherwise, you have three years from the date it's granted to begin the development. If you haven't started work by then, you will probably need to reapply.

My house is in a conservation area, and I want to have solar panels on the garage and roof, do I need permission?

Installing solar panels on your roof will often fall under permitted development rights, meaning an application for planning permission is not required provided certain limits and conditions are met.

The limits and conditions vary based on the type of roof you want to install the solar panels on and the location of the house. See the details below:

·     On a pitched roof, panels should not be installed above the highest part of the roof (excluding the chimney) and should project no more than 200mm from the roof slope or wall surface.

·     On a flat roof the highest part of the solar PV equipment cannot be more than 600mm higher than the highest part of the roof(excluding chimney).

·     The panels must not be installed on a building that is within the grounds of a listed building or on a site designated as a scheduled monument.

·     If your property is in a conservation area, or in a World Heritage Site, panels must not be fitted to a wall which fronts a highway.

As you have stated you’re in a conservation area, you must apply to the local authority for prior approval. This process includes submitting a form to the local planning authority which ensures that you meet the limits set out in legislation.

Forms relating to prior approval for mounting solar equipment can be submitted through the Planning Portal’s online application service and attract a fee of £240.

Visit our solar common projects page for more details and to explore similar permissions.

‍

Can I convert a detached garage into a self-contained living space?

Yes, but you will need to obtain planning permission. Converting a detached garage into a self-contained living space, such as annexe, studio flat, or retail unit, represents a material change of use, particularly if it will function independently from the main house. This is because the garage would no longer be used in connection with the main dwelling and would effectively become a separate residential unit.

What documents to I need to make a planning application?

Your planning application must be made up of:

  • The necessary plans of the site
  • The required supporting documentation
  • The completed form
  • The correct fee.

The local planning authority will not be able to process your application unless the mandatory supporting documentation has been provided. You can also attach any other relevant documentation which you think will help the local authority determine the application.

What supporting documentation must be provided depends on the application type,  development type and local planning authority.

There are two levels of mandatory documents, national and local. If you’re applying online, the service will tell you what mandatory documentation you need to provide and allows you to attach the relevant documents. Most applications will require you to provide a location plan and a site plan.

In addition to the national list, your LPA may produce a list which details any specific documentation that is required to accompany the application. The requirements may vary according to the type of application, i.e. household, full, outline, etc. If you are applying online, this list is available from the supporting documents screen or your local planning authority’s website.

For more information around what to submit visit the how to apply section on Planning Portal.

Can I build a two-storey extension without planning permission?

Two storey rear extensions are considered to be permitted development, meaning they do not require an application for planning permission provided certain limits and conditions are met. If these limits are exceeded then you will need to apply for planning permission from the local planning authority.

Houses on designated land such as national parks or conservation areas are excluded from the permitted development rights and will require an application for planning permission.

To fall within permitted development rights, the extension should be no higher than the existing house, and where it is within two metres of a boundary, the eaves should be no higher than three metres. 

Any double storey extension to the side or front of the house will require planning permission. You can view the full limits and conditions on our Two-storey extension Mini Guide.

If you live in a listed building you will require listed building consent for any major works to the property.

Ask another question

Can’t find what you’re looking for?

Propose a question to help us make Smart Search even smarter
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.